👉 1 Brass natural sand = 2.83 cu.mt =100.00 cubic feet
👉 1 Brass rubble stone =2.83 cu.mt = 100.00 cubic feet
👉 1 brass Brick work 1344 No's bricks required
👉 1 Bag cement = 0.035 cu.mt = 1.23 cubic feet = 50 kg
👉 1 cu.mt =1000 liter
👉 1 Acre = 4000 Sq.mt = 43560 Sq.ft.
👉 1 Hector = 10000 Sq.mt = 107600 Sq.ft
👉 1 Gunta = 101.20 Sq.mt =1089 Sq.ft
👉 For Coloum Minimum 12 mm dia steel bar use
👉 M-20 = M-Stand for Mix & 20 Stand for 20 kn/Sq.mt strength after 28 days curing of concrete .
👉 Window sill height from flooring 75 cm to 90cm .
👉 Window lintel height from flooring 210 cm
👉 Minimum width of Door is 75cm
👉 Minimum 4 no's bar use in coloum and Beam
👉 15 % to 20% Ventilation / opening sufficient for 100 sq.ft flooring area.
👉 1 Tonne Air conditioner (AC) sufficient for 100 sq.ft flooring area.
👉 Head Room for stair case is Minimum 210 cm
👉 kitchen platform height 85 cm from flooring
👉 Minimum skirting height 10 cm .